Updates on Area Road Construction: Paving on 421; Bridge Work in Boone on 321; Widening in Blowing Rock
June 8, 2012. It’s the talk of Boone and Blowing Rock. Will this road construction ever end? Well, the short answer is: yes. Some projects sooner than later, but according to Doug Eller, NCDOT resident engineer, progress is moving right along.
BY PAUL T. CHOATE